Office 020 7946 0196 · Mon to Fri 8:00 to 17:30 · Tottenham Hale, N17Survey visits are free
QUINLAN & DAUGHTER Book a survey

Lofts and rear extensions · Tottenham Hale, N17

Lofts and rear extensions for north London terraces.

We survey, draw, get approval and build, with our own team from a yard in Tottenham Hale. Most of our work is within four miles of it, in N4, N8, N15, N16, N19, N22 and E17.

Survey visits are free and take about an hour. Weekdays, or Saturday mornings.

GROUNDFIRSTLOFTFRONTREARSECTION A-A · REAR DORMER · 1:1002.24 M7.50 MDORMER ROOF 200 MMBELOW RIDGESET BACK200 MM MIN01234MEXISTINGREMOVEDNEW
FIG. 01 · Rear dormer loft, section through a typical Victorian terrace
  • Since 1996
  • 480 lofts
  • 11 people
  • Fixed price before we start
  • 4.8 from 164 reviews
  • Own drawings, own team

What we build

GROUNDFIRSTLOFTFRONTREARSECTION A-A · L-SHAPED DORMER · 1:1002.24 M7.50 MMAIN DORMERBEDROOMSHOWER ROOMBEYOND01234MEXISTINGREMOVEDNEW

Loft conversions

Rooflight, rear dormer, L-shaped, hip-to-gable and mansard. Most take 9 to 13 weeks on site, and most families stay at home while we work.

From £42,000 including VAT

Loft types and prices
GROUND FLOOR PLAN · PROPOSED · 1:100MIDDLE ROOMBOUNDARYUBKITCHEN ANDDINING2.10 MGARDEN

Rear and side-return extensions

Kitchen extensions into the side return or across the back, planned around the drains, the neighbours' walls and the 3 metre rules.

From £68,000 including VAT

Extension types and prices

Five ways into a terrace roof

Which loft you can have depends on the roof you've got, the street you're on and how much room the rules leave. These are the five we build, drawn through a typical Victorian terrace.

  • GROUNDFIRSTLOFTFRONTREARSECTION A-A · ROOFLIGHT · 1:1002.38 MROOFLIGHT150 MM MAX01234MEXISTINGREMOVEDNEW

    Rooflight conversion

    Windows set into the existing slope. The roof keeps its shape, so it needs the most height to start with.

    FROM £42,000 · 6 TO 8 WEEKS · USUALLY PERMITTED DEVELOPMENT

  • GROUNDFIRSTLOFTFRONTREARSECTION A-A · REAR DORMER · 1:1002.24 M7.50 MDORMER ROOF 200 MMBELOW RIDGESET BACK200 MM MIN01234MEXISTINGREMOVEDNEW

    Rear dormer

    The back slope is built out square to make a full-height room. The most common loft on a terrace.

    FROM £64,000 · 9 TO 11 WEEKS · USUALLY PERMITTED DEVELOPMENT

  • GROUNDFIRSTLOFTFRONTREARSECTION A-A · L-SHAPED DORMER · 1:1002.24 M7.50 MMAIN DORMERBEDROOMSHOWER ROOMBEYOND01234MEXISTINGREMOVEDNEW

    L-shaped dormer

    A rear dormer plus a second one over the back addition. Room for a double bedroom and a shower room.

    FROM £80,000 · 11 TO 13 WEEKS · USUALLY PERMITTED DEVELOPMENT

  • AFTERREARREAR DORMERRIDGE

    Hip-to-gable

    For end-of-terrace and semi-detached houses with a sloping end. The hip becomes a brick gable, usually with a rear dormer.

    FROM £84,000 · 11 TO 14 WEEKS · USUALLY PERMITTED DEVELOPMENT

  • GROUNDFIRSTLOFTFRONTREARSECTION A-A · REAR MANSARD · 1:1002.60 M70°70° SLOPEIN SLATEFLAT ROOF, SINGLE PLYFRONT SLOPEUNCHANGED01234MEXISTINGREMOVEDNEW

    Mansard

    A steep 70 degree slope with a flat roof above, usually at the back. Always needs planning permission.

    FROM £108,000 · 14 TO 17 WEEKS · PLANNING PERMISSION

What would yours cost?

Pick your house and the loft you have in mind. The full cost guide adds the bathroom, the stair, the structure and the planning route, and gives a range with build weeks.

A rear dormer on a mid-terrace starts at about £64,000 to £80,000 including VAT, before a bathroom. 9 to 11 weeks on site.

Open the full cost guide

AN ESTIMATE, NOT A QUOTE. WE FIX THE PRICE AFTER A SURVEY VISIT.

Inside the range

  • Design, drawings and structural engineer's calculations
  • Lawful development certificate or planning application, including the council fee
  • Building regulations application and inspections, including the council fee
  • Party wall notices drafted and served
  • Scaffold, temporary roof and council scaffold licence
  • Steels, new floor, insulation, windows and rooflights
  • Stair made in our workshop
  • Fire doors on the stair and linked mains smoke alarms

Recent work

Six recent jobs, written up with the drawings, the problems we found and what they cost.

GROUNDFIRSTLOFTFRONTREARSECTION A-A · L-SHAPED DORMER · 1:1002.24 M7.50 MMAIN DORMERBEDROOMSHOWER ROOMBEYOND01234MEXISTINGREMOVEDNEW
GROUNDFIRSTLOFTFRONTREARSECTION A-A · EXISTING · 1:100ROOF SPACESTORAGE ONLY2.20 M01234M
BEFOREAFTER

FIG. 1 · Existing roof space and the L-shaped dormer, same section line. Drag the line, use the arrow keys, or press a button.

Weston Park, N8 · L-shaped dormer · 12 weeks on site · £100,000 to £110,000

A main bedroom and shower room for a family of four

Drawn to 38.6 cubic metres against the 40 allowed.

Read the project

From first call to sign-off

A rear dormer on a terrace, with no planning complications, usually takes six to seven months from the first call to the final certificate. About ten weeks of that is building.

  1. WEEK 1

    Survey visit

    An hour in your loft. Written budget estimate within five working days.

  2. WEEKS 2 TO 5

    Design

    Measured drawings, a 3D model and two rounds of changes.

  3. WEEKS 5 TO 13

    Approval

    Lawful development certificate or planning permission, and building regulations.

  4. FROM WEEK 5

    Party wall notices

    Two months' notice to your neighbours, served early so it doesn't hold up the start.

  5. AROUND WEEK 12

    Fixed price

    A written price, programme and payment stages. Nothing moves after you sign.

  6. 9 TO 17 WEEKS

    Build

    Our own team, the same subcontractors, a note from Jonah every Friday.

  7. 1 TO 3 WEEKS AFTER

    Sign-off

    Completion certificate, test certificates and everything in one folder.

The dull bits, done properly

Party walls

If the steels for your loft sit in the party wall, your neighbours are entitled to two months' notice under the Party Wall etc. Act 1996. We draft and serve the notices ourselves as soon as the drawings are settled, so the notice period runs while the council is deciding.

Building regulations

Every loft needs building regulations approval: the structure, the insulation and, above all, a protected escape route down the stair to the front door. We make the full plans application and book every inspection.

The Building Safety Act

Since October 2023, any job with more than one contractor needs a named principal designer and principal contractor. On our jobs that is Niamh and the firm, written into the contract, and we sign the compliance statements at the end.

STAIR ELEVATION · 13 RISERS · 1:252.70 M5.60 M RUNRISE 208 MMMAX 220GOING 230 MMMIN 220PITCH 42° MAXOAK HANDRAIL1.90 M HEADROOMAT CENTRE LINE
FIG. 05 · The stair Pat cuts at the bench, drawn at 1:25

Pat and Niamh Quinlan

Pat started the firm in 1996 after nine years on London building sites. Niamh joined in 2018 to draw and get approval for everything we build. Between them they see every job from the survey visit to the final certificate, and one of them will be the person who comes to look at your roof.

4.8 from 164 reviews

  • Niamh drew three versions of the stair before we chose one. The loft was watertight in week four, as the programme said it would be, and Jonah's Friday notes meant I never had to ask where we were.

    Maeve, Crouch End N8

    Rear dormer with shower room · MARCH 2026

  • We got three quotes. This was not the lowest, but it was the only one that listed what we would find in the roof and what it might cost. The steel was the surprise they had warned us about.

    Daniel, Walthamstow E17

    Hip-to-gable and rear dormer · JANUARY 2026

  • We stayed at home with two children under five. They sealed the landing, swept every evening and rang the neighbours before the chimney breast came out. The bath in the loft is the best decision we made.

    Aisha, Stroud Green N4

    Rear dormer, bedroom and bathroom · APRIL 2026

Reviews on this concept site are written examples.

Where we work

We keep our jobs within about half an hour of the yard, so Jonah can be on every site every day.

N4
Finsbury Park, Stroud Green, the south end of the Harringay Ladder
N8
Crouch End, Hornsey, the north end of the Harringay Ladder
N15
South Tottenham, West Green, St Ann's
N16
Stoke Newington, Stamford Hill
N17
Tottenham and Bruce Grove (our own patch)
N19
Archway, Tufnell Park, Upper Holloway
N22
Wood Green, Noel Park, Bounds Green
E17
Walthamstow

Just outside these? Ask. We'll tell you straight away if it's too far for us to run the site properly.

Book a survey visit

An hour in your loft with a tape and a torch, then a written budget estimate within five working days. There's no charge, and nobody will chase you afterwards.